How estimates are prepared

How Repair Cost Atlas Estimates Home Repair Costs

Each guide turns the prices that cost publishers print into a planning range, names the publishers behind it, rates how well they agree, and dates every correction.

01

Where the figures come from

We start from the cost pages that consumer cost publishers print for the same project: Fixr, This Old House, HomeGuide, Bob Vila and Angi / HomeAdvisor. Angi owns HomeAdvisor and the two sites publish the same cost data, so we treat them as one publisher. For each page we record in a source register the figures we use, the page's own date and the date the figures were read, and we use a figure only for the scope the page describes (installed or equipment only, a whole project or a unit price).

Other references answer other questions and are not used as installed prices:

  • retail product listings (The Home Depot) for equipment or material prices only;
  • U.S. Bureau of Labor Statistics wage data, used to compare labor markets for the ZIP code adjustment;
  • government and technical references (DOE, EPA, ENERGY STAR, the Census Bureau's American Housing Survey, NRCA, AHRI) for rules, efficiency and how a system works.

The guides currently cite 142 source pages from 20 publishers. Every one is listed, with what it supports and which guides cite it, on the sources page.

02

How a typical range and average are set

When the publishers agree on the scope, the typical range is a published range and the guide names the publisher. When they report different figures for the same job, we set a planning range that the published figures support and say so: the guide summary quotes each publisher's own range or average, so you can see how far apart they are. For example, the water heater replacement cost guide quotes four publishers side by side before giving its planning range.

Some numbers are ours rather than a publisher's: a midpoint of published ranges, a per-square figure converted from a per-square-foot price, or a total built from unit prices. Those are labeled as our calculation or planning estimate, with the inputs named. When the average a guide shows is not a published national average, the guide says what it is instead of calling it one.

Our standard is that every price is taken from a published source, calculated from one, or labeled as our planning estimate. When we find a figure that does not meet it, we correct the guide and record the change (see reviews and change logs).

03

Confidence ratings

Each guide rates its typical range by how many independent publishers support it and how closely they agree:

Confidence rating rule
RatingRule
HighThree or more independent publishers support the typical range, and their figures agree within roughly ±20%.
MediumTwo independent publishers, or three or more whose figures disagree by more than that.
LowOne publisher, or a range we synthesized or modeled ourselves.

Angi and HomeAdvisor count as one publisher. Retail listings, wage data and technical references do not count toward the rating, because they do not publish installed prices. A low rating does not mean a range is wrong; it means fewer independent figures stand behind it, so a written quote matters more.

04

Labor costs

BLS employee wages are a baseline for the labor market; an employee wage is not the same as a contractor billing rate. A contractor’s invoice may also cover payroll costs, insurance, vehicles, equipment, administration, licensing, travel, warranty obligations, and business overhead.

The BLS wage figures shown in our guides are the national estimates for May 2025, the most recent release at the time of writing. Hourly contractor rates in the guides come from the cost publishers' published ranges, or are labeled as our planning rate when no publisher prints one for that job. They are not BLS figures.

The split between labor and materials in each guide is published by a cost publisher where one exists; otherwise it is our planning estimate and is labeled as such. It should not be read as a universal national rate or as a contractor bid.

05

Regional estimates

A ZIP code helps approximate the regional labor market used for an estimate. It does not reveal an exact neighborhood price and does not represent a live contractor quote.

Regional adjustments reflect labor-market differences only. For a complete 5-digit ZIP code we find its state (or, for eight large metros, the metro area) and divide the BLS May 2025 mean hourly wage for that trade by the national mean wage to get a labor index. The index is applied only to the labor share of the project, which is set for each guide, so a 1.20 labor index changes a project that is 40% labor by about 8%. An incomplete or unrecognized ZIP code uses the national figure.

Worked example

Labor index 1.20 × labor share 40% → project total +8% (0.40 × 1.20 + 0.60 = 1.08)

Equipment, materials, and permit or code allowances remain national or project-level estimates; we do not adjust them by location.

06

Calculator assumptions

Calculators may adjust a planning range for factors such as project size, complexity, access, roof pitch, equipment configuration and material choice. These adjustments make a range more useful for planning; they are not guaranteed charges. The assumptions behind each calculator are listed with it.

07

Reviews and change logs

We review guides in scheduled passes, when we re-read a publisher's page, and when a reader reports a possible error. A review that changes a figure, a source or a statement gets a dated entry in the guide's change log (“What changed”), and the guide's “Updated” date moves to that day. All entries are collected in the corrections log.

We do not monitor publishers' prices continuously. The date shown on a guide is its latest review; a publisher can change its figures before our next one, which is why each source shows the page's own date and the date we read it.

08

Limitations

These figures are informational planning estimates, not contractor quotes, appraisals, engineering specifications, or promises of what a particular project will cost. Hidden damage, code requirements, local conditions, product availability, and contractor scope can materially change a proposal.

How to use these estimates

Use a range to plan questions and compare proposals. Before authorizing work, obtain multiple written, itemized quotes from appropriately licensed and insured contractors and confirm the scope, materials, permits, warranty, and exclusions.

For questions about our methodology or a published estimate, email contact@repaircostatlas.com or see how to report a correction.